Chiller Replacement at McVitie’s Harlesden Factory
CASE STUDY
Fast-Track Chiller Replacement Keeps McVitie's Harlesden Factory on Track
Project Overview
Few factories are as iconic as McVitie’s Harlesden site. A North London landmark since 1902, the factory remains one of Europe’s largest biscuit manufacturing sites, producing millions of biscuits and snacks every day – around 130,000 tonnes every year.
Behind the unmistakable smell of baking is a highly demanding manufacturing operation where temperature control is critical.
When an ageing chiller serving the factory’s chilled-water ring reached the end of its working life, McVitie’s needed a replacement fast. With critical production equipment relying on reliable cooling, downtime was not an option, McVitie’s turned to LH.


The Challenge
The existing chiller formed an important part of the factory’s cooling infrastructure, supplying chilled water to support temperature-sensitive manufacturing equipment.
LH responded immediately. Using its technical expertise and established manufacturer partnerships, the team quickly identified a suitable replacement and progressed the order without delay. Within 12 weeks of the purchase order being placed, the new high-efficiency air-cooled Daikin screw chiller had arrived on site.
McVitie’s on-site team completed the installation, with LH providing specialist commissioning support to get the new system up and running.
“We were delighted to be contacted by such an iconic and well-loved brand. This was a project where speed, technical knowledge and reliability all mattered. “Our manufacturer relationships and experience with large-scale cooling equipment meant we could respond quickly and help the site move from an ageing chiller to a modern, efficient replacement. “The new system delivers operational and environmental benefits, while giving the factory a reliable platform for the future. – Graham Martin, Business Development Manager, LH Plc
The Solution
The replacement chiller was selected to deliver dependable performance in a demanding industrial environment. Designed for process cooling and critical chilled-water applications, the Daikin IV Air Cooled VFD Screw TZ Chiller offers capacities of up to 960 kW, making it well suited to the demands of large-scale food manufacturing.


The Harlesden installation also delivered a significant refrigerant upgrade. The previous system used R-134a. The new chiller operates with, providing an approximately 56% reduction in Global Warming Potential (GWP) compared with the refrigerant it replaced. The result: a more future-focused cooling solution with a reduced environmental impact.
Performance was another key consideration, and the new unit is designed to operate across a wide ambient temperature range – from -20°C to +55°C – providing the flexibility required for year-round operation in demanding conditions. Its variable-speed drive allows compressor capacity to respond to changing cooling demand, helping optimise performance at both full and part load.
“We hope this is the start of a long-term relationship with the Harlesden site. LH is on hand to provide ongoing maintenance support, technical advice and assistance with future upgrades to its HVAC and cooling infrastructure.” – Graham Martin, Business Development Manager, LH Plc
Key benefits
- Fast-track response for a critical manufacturing application
- New chiller delivered within 12 weeks of purchase order
- Specialist commissioning support from LH
- Modern cooling infrastructure for a demanding food manufacturing environment
- Approximately 56% lower refrigerant GWP compared with the previous R-134a system
- Variable-speed compressor technology to support efficient full- and part-load operation
- Potential for lower energy consumption and operating costs
- Reliable year-round performance across a wide operating envelope
- Local technical expertise and ongoing maintenance support
- A future-ready cooling solution supporting one of the UK’s most iconic manufacturing sites
Daikin IV Air Cooled VFD Screw TZ Chiller
Capacity of up to 960 kW
Wide operating Range: from -20°C to +55°C
56% reduction in GWP moving from R-134a to R-513A
Immediate Response: 12 weeks from P.O. to chiller installation
Special commissioning support from LH’s expert team