Croydon Hospital Chiller Refurbishment

CASE STUDY

Extending chiller life and reducing capital expenditure at Croydon University Hospital

Project overview

Croydon University Hospital is one of the area’s principal healthcare facilities. Home to an emergency department and more than 100 specialist services, including 24/7 maternity care, the hospital provides essential services to residents across the borough.

As with all NHS Trusts, maintaining reliable critical infrastructure while managing budgets efficiently is a continual priority. When two RHOSS chillers experienced recurring condenser coil failures, the hospital turned to LH for technical analysis and support.

Rather than recommending another like-for-like repair, LH investigated the wider operation of the chiller and chilled-water system. The assessment identified an underlying system condition that was contributing to unstable chiller operation. By addressing this issue, the project helped reduce unnecessary cycling, improve operating stability and support the long-term reliability and service life of the critical cooling plant.

The Challenge

The hospital’s RHOSS TCAEQY 2220 chillers had experienced repeated condenser coil failures.

Over an eight-year period, condenser coil replacements had been required twice, with each replacement costing approximately £50,000. The hospital had previously been advised that the chillers’ proximity to the mortuary was contributing to excessive corrosion.

 

"We could have simply replaced the condenser coils and walked away, only to repeat the same process when the chillers failed again a few years later. Our clients work with us because we focus on providing the right advice, however. Our priority is ensuring HVAC systems operate as they should, deliver maximum efficiency and achieve the longest possible service life." – Paul King, Project Sales Manager at LH

When a further condenser coil replacement was required, LH Project Sales Manager Paul King was asked to provide a quotation. Rather than simply replacing the failed components, Paul recommended investigating whether corrosion alone could explain the recurring failures.

Drawing on its HVAC expertise and knowledge of RHOSS equipment, LH conducted a detailed assessment of the chillers and the associated chilled-water system.

The investigation confirmed that the condenser coils were leaking. However, the wider assessment identified another significant operational issue: the chillers were cycling more frequently than would normally be expected under stable operating conditions.

“LH has provided consistent support and technical expertise throughout the project at Croydon University Hospital. “Their advice to install a buffer vessel has led to long-term savings, extending asset life, and improving energy performance. Rather than simply replacing failed components, LH took the time to investigate the underlying cause of recurring condenser coil failures identifying an issue that had previously gone undetected. “Paul King put forward a practical, long-term solution that addressed the root cause and improved the stability of the chilled water system - a critical piece of the hospital infrastructure - delivering both operational and financial benefits. “I am impressed with their attention to detail and commitment to problem solving. We will be working with LH on similar projects in the future.” – Matthew Goodard - Senior Project Manager - Croydon Health Services, NHS Trust

Key benefits:

  • Prevention of recurring condenser coil failures
  • Avoidance of £50,000 in replacement costs every four years
  • Extended operational life of the chillers
  • Reduced risk of complete plant replacement, potentially avoiding capital expenditure of approximately £250,000
  • Improved system reliability and uptime
  • Enhanced energy efficiency and reduced operating costs
  • Long-term protection of critical hospital infrastructure

Our Solution

To increase system volume and stabilise operation, two buffer vessels were installed within the chilled water system. By eliminating the short cycling issue, the hospital could avoid repeated condenser coil replacements and significantly reduce the risk of a complete chiller failure, protecting both its budget and critical cooling.

 

Benefit to the Client

By eliminating the short cycling issue, the hospital could avoid repeated condenser coil replacements and significantly reduce the risk of a complete chiller failure, protecting both its budget and critical cooling.